The objective is: 
585.109
The running time is: 
4.68963
The time meeting best is: 
0.741312
Location: 0(load: 10189) 
 Route 0(load: 4350) 9 12 
 Route 1(load: 2400) 6 7 3 4 8 
 Route 2(load: 3439) 11 10 5 0 1 2 15 14 13 16 21 19 18 17 20 